With all the interior build out going on there has been a healthy amount of epoxy thrown around over the past few days. Below We took scrap 3/4 inch marine ply and ripped it into 1/2 inch strips. With a good coat of epoxy we have cleat materials ready for future projects.
Our last task of any work day was epoxy. We vacuum the boat, then use every available space to set up epoxy stations. The everything cure over night and we are ready to roll the next morning.
Our last task of any work day was epoxy. We vacuum the boat, then use every available space to set up epoxy stations. The everything cure over night and we are ready to roll the next morning.